Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.12984798

- Product Categories
- Friendly Links
Information Name: | Anshun epoxy floor paint |
Published: | 2014-04-03 |
Validity: | 365 |
Specifications: | According to customer requirements |
Quantity: | 888888.00 |
Price Description: | |
Detailed Product Description: | [24-hour hotline: 13809488488] Guizhou Road Lyle Floor Engineering Co., Ltd. Anshun floor paint, epoxy Anshun Anshun epoxy floor paint, epoxy floor Anshun, Anshun epoxy floor paint Anshun parking lot floor paint, anti-static floor paint Anshun Anshun industrial plants epoxy floor paint, floor coating thin mortar Anshun, Anshun anti-static floor paint; Anshun epoxy floor paint will be the most sophisticated technology, Best price for you to provide the most thoughtful Anshun floor paint, epoxy Anshun Anshun epoxy floor paint, epoxy floor Anshun, Anshun epoxy floor paint, floor paint parking Anshun Anshun Anti-static epoxy floor paint, epoxy floor paint industrial plants Anshun Anshun thin coating of mortar flooring, anti-static floor paint Anshun service! Welcome to your call. Mark all standard runway runway 400 meters should be marked with a white line along the right side of the lane ran into the direction of the line is the calculation of the width of each channel. All of the starting line (in addition to the arc starting line) and the finish line at right angles to the line should be marked with the lane. Close to the finish line, ran along the direction you want to mark the literal height of 0.50m little figures on the runway. All flags line width of 0.50m. All distances are close to the starting side from the starting line to the finish line on the side away from the end point measured clockwise. All tired and starting line should run to the provisions of the measurement, the deviation from the starting line ran the length does not exceed 0.0001 * L, not less than 0.000m. Where L is the length of the unit m is ran. ????? Mark shall be in accordance with all of the runway, "the IAAF standard track 400m draw a line chart." To mark not only in conflict with international competition, domestic competition may increase markers. IAAF type IV and above construction site must comply with IAAF marks and color requirements. If the color of the runway surface so that the mark is not easy to distinguish, must apply to the International Union men be allowed to use other colors. ????? Photographic equipment in order to ensure a positive end photographic equipment to determine the standard and easy to read, and the finish line at the intersection with lane lines should be designed to fit the way painted black. Any design must be within the scope of the cross, may not exceed the bounds 20mm, and shall not extend to the leading edge of the finish line. After the finish line 1.00m, 3.00m and 5.00m respectively at 30mm wide, 0.80m long (2.00m at 0.40m) white lines marked (non-mandatory). ????? For all the starting line, straights, and the arc-shaped protrusion, the basic requirements are: the shortest route from every athlete is allowed to select the same, and shall not be less than the prescribed distance, that is, not allow negative bias. 800m and 800m project following athletes to the starting lane, including the 400m sprint, including the lanes must be completely run. 800m lane starting to run and keep running in the road to the end of the first corner. ????? At the end of the first curve, the line width should be 0.05 (grab road marking line) intersects with the lane line and a clear sign to indicate that athletes can grab fatigue. In order to facilitate the identification athletes grab Line Road, at the intersection of the trail and cut in line at a runway placed no higher than 0.15m, and grab the best channel line and lane lines or different colored cone prism as a symbol. 800m above the starting line of a race with a curved arc, no lane. Guizhou Road Lyle Floor Engineering Co., Ltd. Contact: Mr. Lin Tel: 13809488488 Tel :0851-2228236 QQ: 379852519 official website: www.daolaier.com |
Admin>>>
You are the 13428 visitor
Copyright © GuangDong ICP No. 10089450, Guizhou Road Lyle Floor Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 13428 visitor
Copyright © GuangDong ICP No. 10089450, Guizhou Road Lyle Floor Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility