Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.12984798

- Product Categories
- Friendly Links
Information Name: | Carey parking dash, |
Published: | 2014-04-06 |
Validity: | 365 |
Specifications: | According to customer requirements |
Quantity: | 888888.00 |
Price Description: | |
Detailed Product Description: | [24-hour hotline: 13809488488] Guizhou Road Lyle Floor Engineering Co. Kerry parking dash, Carey floor paint, epoxy Carey, Carey epoxy floor paint, epoxy Carey resin flooring, epoxy floor paint Carey, Carey parking lot floor paint, anti-static floor paint Carey, Carey industrial plants epoxy floor paint, floor coating thin mortar Carey, Carey antistatic floor paint; Carey epoxy floor paint will be the most sophisticated technology, the most favorable price to provide you with the most thoughtful Carey floor paint, epoxy Carey, Carey epoxy floor paint, Kay in epoxy floor, epoxy floor paint Carey, Carey parking floor paint, anti-static epoxy Carey floor paint, epoxy floor paint industrial plants Carey, Carey mortar floor coating thin Carey anti-static floor paint service! Welcome to your call. The reason concrete analysis of a cement from the sand, uneven mixing????? Uneven mixing mortar, mortar shrinkage when watering, draft varies, sand, peeling from too much water at the prone. ????? 2, improper preparation of water-cement ratio??????? (1) water-cement ratio is too small, resulting in large amount of cement, mortar, relatively dry and hard, construction difficulties, undermining the strength of the surface layer. ??????? (2) water-cement ratio is too large. In order to enhance the workability of the mix, arbitrarily increase the water-cement ratio, resulting in too little amount of cement, surface bleeding phenomenon, mortar strength decreases, the surface layer do not wear loose cement gray appear after walking surface, resulting in from sand phenomenon. ?????? 3, the raw material does not meet the requirements??????? (1) of sand particle size too small, too large mud. Sand particle size is too small, when mixing cement ratio is increased, reducing the strength; excessive sand, clay, cement content per unit volume is reduced, the impact force at the time of mixing the adhesive, reducing the strength, resulting in surface resistance Grinding reduced, resulting from sand phenomenon. ??????? (2) low-grade cement strength, stability using substandard, expired, wet, caked cement. Cement stored for too long, improper care, appeared damp, agglomeration, is still used for concrete floor construction, resulting in cement activity affected, resulting in the surface layer of mortar strength is reduced; cement stability failure, when setting and hardening deformation is too large, greatly reduces the overall strength, surface loose in the external force, the surface layer off easily, peel, formed from the sand. Guizhou Road Lyle Floor Engineering Co., Ltd. Contact: Mr. Lin Tel: 13809488488 Tel :0851-2228236 QQ: 379852519 official website: www.daolaier.com |
Admin>>>
You are the 13428 visitor
Copyright © GuangDong ICP No. 10089450, Guizhou Road Lyle Floor Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 13428 visitor
Copyright © GuangDong ICP No. 10089450, Guizhou Road Lyle Floor Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility