Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.12984798

- Product Categories
- Friendly Links
Information Name: | Duyun plastic basketball court |
Published: | 2015-03-21 |
Validity: | 365 |
Specifications: | According to customer requirements |
Quantity: | 1888888.00 |
Price Description: | |
Detailed Product Description: | Telephone 13809488488 0851-84848285 Guizhou Road, Lisle Floor Engineering Co., Ltd. specializes labor and materials to undertake plastic stadium Duyun Duyun plastic basketball courts, tennis courts plastic Duyun, Duyun plastic track, welcome your calls. Hard tennis foundation construction process an acrylic Stadium pitch, asphalt base ground handling (1) Drainage: The stadium should be 5% of the drainage slope, drainage direction parallel to the direction of the side of the drainage network. (2) Flatness: ruler with 3m height difference between two points in either direction, not more than 3mm, the density of asphalt base must be enough to reach more than 95%. (3) conservation: asphalt shall be stable for more than 10 days, with high pressure water to clean the surface. (4) testing the waters: for the court to test the water, the test site flatness, in the depression of the water more than 3mm marking with chalk, crayon or oil pen can not be used to prevent contamination of ground asphalt. 2, the construction process AONAC acrylic paints (1) patch formation: water-based high-strength water-based asphalt primer watered doped silica sand (60-80 mesh) fully patched After stirring at the above chalk mark. A repair can not be more than 2mm thick. For thicker patches, you can use an adhesive patch AONAC concrete patching material. (2) the filling layer: water-based high-strength water-based asphalt primer watered doped silica sand (60-80 mesh) after stir with a rubber scraper scratch rake twice, increasing the strength of the stadium. Asphalt tennis court a basis resilient construction technology, asphalt base ground handling requirements and processing base with asphalt same two hard courts, the construction process of acrylic paint (1) Patch level: strengthening watered asphalt base material doped with rubber particles (50 to use A waterborne After 80 mesh) scratch again stir the audience, so that the ground is more uniform, dense, enhance the binding surface and coatings to increase the strength of the stadium. (2) the elastic layer: After stir with a thick elastic layer coating with a rubber scraper rake watered twice Scratch audience, increase elasticity stadium. After stirring for 14 hours to be fully watered with AONAC thin elastic coating is dry scraping with a rubber rake scratch twice the audience again, further increasing the pitch elasticity and leveling rough surface layer of coarse particles, so that the surface layer of fine uniform. (3) strengthening layer: plastic water-based primer watered doped silica sand (60-80 mesh) after stir with a rubber scraper rake scratch again, increase the intensity of the stadium. (4) the texture layer: surface color with acrylic paint mixed with quartz sand watered (100 to 120 mesh), stir the audience scratch again, and play to improve the ball and wear effects. (5) facing layer: 4 hours after curing dry, colored surface with acrylic paint mixed with sand watered no audience and then scratch again, so colorful and pleasing to the eye, with a weather-resistant and anti-UV properties, more beautiful and durable. (6) crossed: acrylic painting white lines stadium boundaries by using the masking line tightly glued to the ground to prevent the edges with a brush straight white line paint brush acrylic paint Guizhou Road Lyle Floor Engineering Co., Ltd. Contact: Lin Tel: 1389488488 Tel: 0851-84848285 QQ: 379852519 official website: www.daolaier.com |
Admin>>>
You are the 13428 visitor
Copyright © GuangDong ICP No. 10089450, Guizhou Road Lyle Floor Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 13428 visitor
Copyright © GuangDong ICP No. 10089450, Guizhou Road Lyle Floor Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility