Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.12984798

- Product Categories
- Friendly Links
Information Name: | Carey plastic basketball court |
Published: | 2015-03-21 |
Validity: | 365 |
Specifications: | According to customer requirements |
Quantity: | 1888888.00 |
Price Description: | |
Detailed Product Description: | Telephone 13809488488 0851-84848285 Guizhou Road, Lisle Floor Engineering Co., Ltd. specializes labor and materials to undertake plastic Carey Stadium Carey plastic basketball courts, tennis courts plastic Carey, Carey plastic track, welcome your calls. A construction process, the construction conditions: Temperature: ground temperature of not less than 5 ℃, not higher than 45 ℃; Humidity: Relative humidity less than 85%; grade: not less than 3: 1000, not more than 5: 1000; Flatness : height not exceeding three meters straightedge 3mm; Second, the construction program 1. Test the water: flatness testing ground, unable to meet the requirements of the foundation repair contractor should be in accordance with the demands of the construction of the stadium. A, the trial finished stadium ground water inspection, water location with white chalk circle drawn; B, with the special paint and sand / cement stir after the repair department; C, after the completion of a measure with a ruler there, The error control in less than 3mm; D, and then turn on the water to check the whole repair is completed, the water at a depth of no more than 3mm is qualified, may be the next step of construction. 2. Construction Primer: A, primer A: B material according to 5: 1: 4 to 4.5 with water stir, along with the court roll / Scratch Scratch evenly on the ground; B, generally dry time of 6 hours , let it dry examination venues, eradicate rough, raised parts sand particles; C, turn on the water to check, if found water location, treatment with (1). 3. Construction of the first middle: A, Tu 1: 1 against the sand: 0.5 against the cement: the amount of water according to the ratio of mixing, stir the material along the longitudinal course material down to the ground, into strips with a special scratch the subsequent uniform scratch; B, anti-scratch scraping to the sidelines, can not stop; C, generally dry time is 6 hours, let it dry after the site inspection, eradicate rough, raised position, ensure that the ground is smooth and no large particles; D, drain inspection, if found water location, treatment with (1). 4. Construction of the second track middle: the ratio of the coating as a second track along the stadium scratch coating, no need to test the water, uproot large particles bump 5. Construction first dichroic finish (finish 1: 0.3 sand). A, according to the international standard size, based on the color of the cable have been identified, according to separate different colors of construction; B, after the material stir, pour the material along the longitudinal pitch on the ground, put into strips and then scrape with a special uniform scratch; C When scraping to the sidelines anti-scratch, can not stop; 6. Construction of the second channel color level (1: 0.2 sand). A, according to the international standard size, based on the color of the cable have been identified, according to separate different colors of construction; B, after the material stir, pour the material along the longitudinal pitch on the ground, put into strips and then scrape with a special uniform scratch; C When scraping to the sidelines anti-scratch, can not stop; 7. the applicator surface color: Portrait of construction along the golf course, not sand. A, separated by different colors of construction; B, after mixing the material along the longitudinal course material down to the ground, put into strips and then scrape with a special uniform scratch; C, anti-scratch scraping to the sidelines, you can not stop; D. The best is behind the front roller close shave with short wool roll once, to avoid scratches and India. Note: 25KG / barrel is divided into two barrels of paint, bailer amount of 1.5 to 2 to 8. Scoop crossed crossed with a special paint. A, the standard size Masking paint stick to the ground; B, with a special marking paint brush to brush the seam between the position; C, slowly lift the boundaries of paper from the top is dry. 9. Completion cleared. Note: Summer ground temperature is not higher than 45C, not winter when the ground temperature is below construction 5C, separation layer / plain surface, spray the surface if the construction equipment, the surface better. Guizhou Road Lyle Floor Engineering Co., Ltd. Contact: Mr. Lin Tel: 1389488488 Tel: 0851-84848285 QQ: 379852519 official website: www.daolaier.com |
Admin>>>
You are the 13428 visitor
Copyright © GuangDong ICP No. 10089450, Guizhou Road Lyle Floor Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 13428 visitor
Copyright © GuangDong ICP No. 10089450, Guizhou Road Lyle Floor Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility